Concrete Driveway Cost Calculator: Oregon

Quick answer: a new plain concrete driveway for two cars (about 600 sq ft, 4 in. thick) in Oregon costs about $4,900 (range $3,700–$6,100). Replacing an old driveway, including tear-out, runs about $6,100.

A 2-car driveway is about 20×30 = 600 sq ft.
Estimate —Details ↓
Your estimate
—
—

Estimate only. Get at least three written local quotes.

Copy link to this result

Driveway cost by finish in Oregon

For a 600 sq ft driveway, 4 in. thick, new install.

FinishTypicalRangePer sq ft
Plain gray (broom finish)$4,900$3,700–$6,100$8.12
Colored / stained$6,100$4,900–$7,300$10.15
Exposed aggregate$6,700$5,500–$7,900$11.17
Stamped / decorative$9,100$7,300–$11,000$15.23
Asphalt (for comparison)$3,700$2,400–$4,900$6.09

Driveway cost by size

DrivewayAreaPlain concreteStampedAsphalt
1-car (12×20)240 sq ft$1,900$3,700$1,500
1-car long (12×33)400 sq ft$3,200$6,100$2,400
2-car (20×30)600 sq ft$4,900$9,100$3,700
2-car (24×30)720 sq ft$5,800$11,000$4,400
3-car / long1,000 sq ft$8,100$15,200$6,100

What drives driveway cost

Finish. Plain broom-finished concrete is cheapest. Color, exposed aggregate and stamping add labor and materials.

Site prep. Grading, a compacted gravel base and drainage matter more than anything for a driveway that does not crack.

Thickness and steel. 4 in. is standard for cars; 5–6 in. with rebar is better for trucks, RVs and cold climates.

Oregon's overall price level is 103.4 on the BEA index (U.S. = 100), the 12th most expensive of 51 states and DC. Labor is about 45% of a concrete job, so a typical project here costs 2% higher than the national average of $4,800.

Oregon vs. nearby states

StatePrice levelPlain, 600 sq ft
Oregon103.4$4,900
California110.7$5,000
Idaho95.5$4,700
Nevada100.0$4,800
Washington107.0$5,000

Frequently asked questions

How much does a concrete driveway cost in Oregon?

About $8.12 per sq ft for plain concrete, or $4,900 for a 600 sq ft two-car driveway.

Is concrete or asphalt cheaper?

Asphalt is cheaper up front, about $3,700 for the same 600 sq ft, but needs sealing every few years and lasts 15–25 years versus 25–40 for concrete.

How much concrete do I need for a driveway?

Multiply length × width × thickness in feet and divide by 27 for cubic yards. A 20×30 ft driveway 4 in. thick needs about 7.4 cubic yards, plus 10% extra.

How long before I can drive on new concrete?

Usually about 7 days for cars and up to 28 days for heavy vehicles, when concrete reaches most of its strength.

More Oregon home cost calculators

Sources: Angi, HomeGuide, Homewyse, Thumbtack and Concrete Network 2026 driveway cost data; U.S. BEA, Regional Price Parities by State, all items, 2024 (released Feb 2026). Estimates only; local quotes can differ. See our methodology.