Concrete Driveway Cost Calculator: Washington
Quick answer: a new plain concrete driveway for two cars (about 600 sq ft, 4 in. thick) in Washington costs about $5,000 (range $3,700–$6,200). Replacing an old driveway, including tear-out, runs about $6,200.
Driveway cost by finish in Washington
For a 600 sq ft driveway, 4 in. thick, new install.
| Finish | Typical | Range | Per sq ft |
|---|---|---|---|
| Plain gray (broom finish) | $5,000 | $3,700–$6,200 | $8.25 |
| Colored / stained | $6,200 | $5,000–$7,400 | $10.32 |
| Exposed aggregate | $6,800 | $5,600–$8,000 | $11.35 |
| Stamped / decorative | $9,300 | $7,400–$11,100 | $15.47 |
| Asphalt (for comparison) | $3,700 | $2,500–$5,000 | $6.19 |
Driveway cost by size
| Driveway | Area | Plain concrete | Stamped | Asphalt |
|---|---|---|---|---|
| 1-car (12×20) | 240 sq ft | $2,000 | $3,700 | $1,500 |
| 1-car long (12×33) | 400 sq ft | $3,300 | $6,200 | $2,500 |
| 2-car (20×30) | 600 sq ft | $5,000 | $9,300 | $3,700 |
| 2-car (24×30) | 720 sq ft | $5,900 | $11,100 | $4,500 |
| 3-car / long | 1,000 sq ft | $8,300 | $15,500 | $6,200 |
What drives driveway cost
Finish. Plain broom-finished concrete is cheapest. Color, exposed aggregate and stamping add labor and materials.
Site prep. Grading, a compacted gravel base and drainage matter more than anything for a driveway that does not crack.
Thickness and steel. 4 in. is standard for cars; 5–6 in. with rebar is better for trucks, RVs and cold climates.
Washington's overall price level is 107.0 on the BEA index (U.S. = 100), the 6th most expensive of 51 states and DC. Labor is about 45% of a concrete job, so a typical project here costs 3% higher than the national average of $4,800.
Washington vs. nearby states
Frequently asked questions
How much does a concrete driveway cost in Washington?
About $8.25 per sq ft for plain concrete, or $5,000 for a 600 sq ft two-car driveway.
Is concrete or asphalt cheaper?
Asphalt is cheaper up front, about $3,700 for the same 600 sq ft, but needs sealing every few years and lasts 15–25 years versus 25–40 for concrete.
How much concrete do I need for a driveway?
Multiply length × width × thickness in feet and divide by 27 for cubic yards. A 20×30 ft driveway 4 in. thick needs about 7.4 cubic yards, plus 10% extra.
How long before I can drive on new concrete?
Usually about 7 days for cars and up to 28 days for heavy vehicles, when concrete reaches most of its strength.
More Washington home cost calculators
Sources: Angi, HomeGuide, Homewyse, Thumbtack and Concrete Network 2026 driveway cost data; U.S. BEA, Regional Price Parities by State, all items, 2024 (released Feb 2026). Estimates only; local quotes can differ. See our methodology.