Quick answer: a new plain concrete driveway for two cars (about 600 sq ft, 4 in. thick) in California costs about $5,000 (range $3,800–$6,300). Replacing an old driveway, including tear-out, runs about $6,300.

A 2-car driveway is about 20×30 = 600 sq ft.
Estimate —Details ↓
Your estimate
—
—

Estimate only. Get at least three written local quotes.

Copy link to this result

Driveway cost by finish in California

For a 600 sq ft driveway, 4 in. thick, new install.

FinishTypicalRangePer sq ft
Plain gray (broom finish)$5,000$3,800–$6,300$8.39
Colored / stained$6,300$5,000–$7,500$10.48
Exposed aggregate$6,900$5,700–$8,200$11.53
Stamped / decorative$9,400$7,500–$11,300$15.72
Asphalt (for comparison)$3,800$2,500–$5,000$6.29

Driveway cost by size

DrivewayAreaPlain concreteStampedAsphalt
1-car (12×20)240 sq ft$2,000$3,800$1,500
1-car long (12×33)400 sq ft$3,400$6,300$2,500
2-car (20×30)600 sq ft$5,000$9,400$3,800
2-car (24×30)720 sq ft$6,000$11,300$4,500
3-car / long1,000 sq ft$8,400$15,700$6,300

What drives driveway cost

Finish. Plain broom-finished concrete is cheapest. Color, exposed aggregate and stamping add labor and materials.

Site prep. Grading, a compacted gravel base and drainage matter more than anything for a driveway that does not crack.

Thickness and steel. 4 in. is standard for cars; 5–6 in. with rebar is better for trucks, RVs and cold climates.

California's overall price level is 110.7 on the BEA index (U.S. = 100), the most expensive in the country. Labor is about 45% of a concrete job, so a typical project here costs 5% higher than the national average of $4,800.

California vs. nearby states

StatePrice levelPlain, 600 sq ft
California110.7$5,000
Arizona100.7$4,800
Nevada100.0$4,800
Oregon103.4$4,900

Frequently asked questions

How much does a concrete driveway cost in California?

About $8.39 per sq ft for plain concrete, or $5,000 for a 600 sq ft two-car driveway.

Is concrete or asphalt cheaper?

Asphalt is cheaper up front, about $3,800 for the same 600 sq ft, but needs sealing every few years and lasts 15–25 years versus 25–40 for concrete.

How much concrete do I need for a driveway?

Multiply length × width × thickness in feet and divide by 27 for cubic yards. A 20×30 ft driveway 4 in. thick needs about 7.4 cubic yards, plus 10% extra.

How long before I can drive on new concrete?

Usually about 7 days for cars and up to 28 days for heavy vehicles, when concrete reaches most of its strength.

More California home cost calculators

Sources: Angi, HomeGuide, Homewyse, Thumbtack and Concrete Network 2026 driveway cost data; U.S. BEA, Regional Price Parities by State, all items, 2024 (released Feb 2026). Estimates only; local quotes can differ. See our methodology.